March 2019

Last updated: 24 Apr, 2019 10:45am

This month we have been working on the bulk filling of the existing Ephemeral watercourse. 

We also started ground water drainage and commenced with the installation of the collector manholes.

The majority of unwanted soil between the old drains has almost finished being removed.

The existing drains have been checked to confirm there is no sediment contamination present.

There was also some onsite compactor testing carried out, and the reservoir embankment earthworks were initiated.